Renjiaba 12.6 MW Hydro

Renjiaba 12.6 MW Hydro

The purpose of the project activity is to generate electricity using hydro potential available in the upstream of Fujiang River, Sichuan Province, P. R. China. The total installed capacity of the proposed project is 12.6 MW (6.3 MW * 2). With a rated water head of 33.7 m and rated flux of 45.0 m3/s, the project is expected to generate 81400 MWh of electricity in a year, and 77458 MWh will be exported to the grid. The generated electricity will be exported to the Central China Power Grid (CCPG), a state government owned power utility company. The estimated of emission reduction is 73089 tCO2e.

Plats
Pingwu, Kina 
Projektägare
Pingwu Chuanjiang Hydropower Development Co., Ltd 
Projekttyp
Vatten 
Metodik
AMS-I.D. 
Årlig reduktion
73,090 t 
Kraftproduktion
12.60 MW 
UNFCC ID
Gold Standard Id
 
Status
Registrerad